Moving on in our Bridge unit, we started talking about suspension bridges. The 3rd Grade engineers are becoming very savvy about how to build a sturdy and stable bridge. I told the kids I wanted them to build a suspension bridge, but I would only give them on piece of string, one 5 inch section of tape, and 2 reading textbooks. Their bridge would be tested in the end.
First, the engineers developed a plan.
Then, they started putting their ideas into action. There were some different approaches.
These bridges all were 'suspension' bridges, but they wouldn't hold any weight. The books would topple right over.
A good first step into building suspension bridges. Watch out for Part 2!
No comments:
Post a Comment